TRANSFORM ELECTRICAL BIM/VDC FROM COST CENTER TO PROFIT CENTER

Exclusively focused on the Electrical Construction Industry’s execution of Work in the field, BIMWerks presents a transformative approach to BIM/VDC services, addressing the challenges encountered by today’s Electrical Trade Contractors. By leveraging BIM/VDC technologies, fully integrated off-site manufacturing (OSM), and innovative enterprise-wide best practices, BIMWerks delivers POWER-ONe™, an ENTERPRISE-WIDE, MADE-TO-ORDER MASS PRODUCTION SYSTEM, redefining the way Work is carried out in the field and enabling unprecedented improvements in productivity, efficiency, and profitability.

BIMWerks, in partnership with its sister company, PREFABWerks, has proven its ability to deliver on this promise. POWER-ONe™ has been implemented in over fifteen large and complex projects spanning the healthcare, education, hospitality, and public works sectors. By ensuring the timely design and manufacture of OSM prefabricated assemblies, POWER-ONe™ delivers 55%-65% of the Work traditionally done in the field effectively increasing the Electrical Trade Contractor’s scarce and indispensable work force capacity in support of new business opportunities and increased market share.

The POWER-ONe™ integrated framework, grounded in a Field Work Breakdown Structure, considers work package sequence and manpower requirements for the installation of both OSM prefabricated assemblies and non-OSM Work.  Given the unprecedented timely availability of OSM executable work packages and the efficiency with which they are installed in the field, the project schedule is transformed in a manner that truly aligns the Electrical Trade Contractor and General Contractor’s project goals and objectives enabling significant improvements in project level quality, time and financial targets.

Services

POWER-ONe™ Suite

A fully integrated, enterprise-wide suite of services aimed at leveraging investment in BIM/VDC technologies, electrical design and off-site manufacturing to accelerate the installation of mass-produced, made-to-order prefabricated assemblies and achieve profitability. BIMWerks understands that these investments can only create value by understanding and redesigning every aspect of the project life cycle in support of these technologies. The POWER-ONe™ Unified Best Practices create an integrated framework across all elements of the Project Life Cycle required to transform the manner by which Work is efficiently executed in the field within timeframes previously unattainable.

  • Field Execution Management

  • Project Administration

  • POWER-ONe™ Live Work Schedule (LWS)

  • Electrical BIM / VDC Technology

  • PREFABWerks Integrated OSM

General BIM/VDC

A fully integrated, enterprise-wide service aimed at leveraging investment in BIM/VDC technologies, electrical design and off-site manufacturing to accelerate the installation of mass-produced, made-to-order prefabricated assemblies and truly drive profitability. BIMWerks understands that these investments can only drive value by understanding and redesigning every aspect of the project life cycle in support of these technologies. The POWER-ONe™ unified Best Practices create an integrated framework across all elements of the Project Life Cycle required to transform the manner by which Work is efficiently to the field within timeframes previously unattainable.

  • BIM Coordination

  • Electrical Design

  • Coordination Modeling

PREFABWerks - Electrical OSM

A fully integrated, enterprise-wide service aimed at leveraging investment in BIM/VDC technologies, electrical design and off-site manufacturing to accelerate the installation of mass-produced, made-to-order prefabricated assemblies and truly drive profitability. BIMWerks understands that these investments can only drive value by understanding and redesigning every aspect of the project life cycle in support of these technologies. The POWER-ONe™ unified Best Practices create an integrated framework across all elements of the Project Life Cycle required to transform the manner by which Work is efficiently to the field within timeframes previously unattainable.

  • Underground Duct Bank Assemblies

  • Underground Cage Assemblies

  • Electrical Room Conduit Assemblies

  • Overhead Conduit Assemblies

  • Electrical Panel Assemblies

  • In-Slab Assemblies

  • In-Wall / In-Ceiling Assemblies

  • Branch Wire Assemblies

  • Headwall Multi-Trade Assemblies

  • Light Fixture Assemblies

  • J-Hooks / Trapeze Assemblies

  • Miscellaneous Electrical Assemblies

On-Site Technology

A fully integrated, enterprise-wide service aimed at leveraging investment in BIM/VDC technologies, electrical design and off-site manufacturing to accelerate the installation of mass-produced, made-to-order prefabricated assemblies and truly drive profitability. BIMWerks understands that these investments can only drive value by understanding and redesigning every aspect of the project life cycle in support of these technologies. The POWER-ONe™ unified Best Practices create an integrated framework across all elements of the Project Life Cycle required to transform the manner by which Work is efficiently to the field within timeframes previously unattainable.

  • Trimble Layout

  • Scan To BIM

  • 360^ Photo/Video Documentation

  • 3D Laser Scanning

Why BIMWerks

Value Engineering

Electrical Virtual Design and Construction (VDC) is the process of creating a digital model of an electrical system before construction begins, using specialized software and tools.

LOD 5OO Level

Electrical Virtual Design and Construction (VDC) is the process of creating a digital model of an electrical system before construction begins, using specialized software and tools.

Turn Cost Center into Profit Center

Electrical Virtual Design and Construction (VDC) is the process of creating a digital model of an electrical system before construction begins, using specialized software and tools.

High Productivity and Efficiency

Electrical Virtual Design and Construction (VDC) is the process of creating a digital model of an electrical system before construction begins, using specialized software and tools.

Featured Projects

Electrical Virtual Design and Construction (VDC) is the process of creating a digital model of an electrical system before construction begins, using specialized software and tools.

JACKSON MEMORIAL WEST

ORLANDO HEALTH HOSPITAL

LOCKHART STADIUM